Home Design + Decor

Second Story Framing

June 15, 2016

The second story framing is pretty much complete! We did a walk through with the builder last week, going through aspects that need to be corrected. i.e. missing a window here, this should be a pocket door not a regular door, etc. Missing a window might sound crazy, right? It’s actually not that big of a deal. The front door is actually incorrect since we are having a custom door made, but it will be fixed.

When you’re building a custom home mistakes will be made, and we understand that. You just have to be diligent in reviewing all the details and making note of that during check-in periods. I feel like I’m a broken record with this statement, but I can really start to visualize the scale of things now! I’m just a visual person, and it just feels so different to see on paper then to see it in-person. The house will be inspected this week for the hurricane clips that were put in to secure things and then we’ll start sheeting later this week, I believe. Or, that’s what I’m told by Ben at least. 🙂

 

More soon,

LL

1 Framing (178)

IMG_5377

Stairs were just put in this week (as opposed the ladder which was making me a little nervous last week!)

Stairs were just put in this week (as opposed the ladder which was making me a little nervous last week!)

Back patio

doors leading to back yard

Save

Save

Save

Save

Save

You Might Also Like

No Comments

Leave a Reply